This module contains the following features:
- Provide documented guideline to the site inspector within the
system that can be referred to before selecting a potential site
- Provide a check list in the system to be used to validate the
value of the selected site
- Calculate the ROI/profitability from the potential site using the
cost benefit analysis (CBA), considering the panel cost
amortization over 5 years and calculate the profitability at the
end of 5th. year and 6th. year onwards.
- The profitability analysis will include ROI, Profitability Analysis
(depreciation), NPV, as well as Payback methods as per the
-- Ads requirement
- Submit the CBA for the potential site along with photo and
location map for marketing team is recommendation for whether
or not the potential site is marketable
- Marketing team can recommend, raise queries, deny the
request.
- On approval from marketing the next approval request will be
raised for approval by the internal head.
- Once obtaining the approval from internal head, the application
will be submitted to the respective office depending on the type
of owner (government or private). And the status of the approval
will be maintained and reported in the status report.
- Once the approval is obtained from the council, the development
team will raise a Job Production Order (JPO) for that site. The
JPO would contain Job No., Date, Site No., Location, Type, Size,
Jobs (Vinyl installation, Illumination, Panel Erection, Printing,
Cutting Trees, Others provide text box to enter text). It will also
provides Job Description(text box) and Priority dropdown (High,
Medium, Low)
- Once the approval is obtained from the council, the development
team will raise a Job Production Order (JPO) for that site. The
JPO would contain Job No., Date, Site No., Location, Type, Size,
Jobs (Vinyl installation, Illumination, Panel Erection, Printing,
Cutting Trees, Others provide text box to enter text). It will also
provides Job Description(text box) and Priority dropdown (High,
Medium, Low)
- Production team will open this JPO and accept it in the system.
As soon as it is accepted the status of the JPO will become
"New"
- After 2 days of acceptance of the JPO the status will
automatically change to In Process. This duration will
configurable.
- Production manager will identify the tasks and assign the person
to the same.
- Production team will raise purchase order requisition for getting
the various job done as listed in the JPO
- System will obtain recommendation for the PO
- Obtain approval for generating the PO
|
|
|
 |